Skip to content

For carpentryAvailable now

Framing, doors and trims counted off the plans.

Framing by stud size and height to slab, blocking, door frames and hardware, skirting and architraves. Priced from your labour page, checked by your estimator.

Set up by us in your own Claude account. How the estimating plugin works.

  • NDA before we see a drawing
  • Runs in an account you own
  • Your files stay yours
  • Two founders, Brisbane, listed simPRO partner
A carpenter standing on a timber wall frame during framing

Sound familiar?

Fifty things on the plan, and some always get missed.

Framing heights, blocking, door frames, skirting and architraves each come off a different sheet. The labour page feeds the job cards, so one missed stud height is wrong on every card.

What you get back

Three steps. The last one is yours.

  1. 01

    Drop in the architectural set

    Plans, wall types, RCPs, sections, door and finishes schedules, as sent. The spec too, for fire-rated door sets.

  2. 02

    Get back framing, doors and fix-out

    Framing by stud, centres and height to slab. Blocking in metres. Doors and hardware by door number. Trims in metres, each with its sheet.

  3. 03

    Your estimator decides

    The review lists what to check first: a level with no section, a door missing from the schedule, an item that may sit with joinery.

A carpenter standing on a timber wall frame during framing
On site

In your units, from your drawings

Your workbook for a carpentry tender

  • Framing by stud size and centres, height to slab
  • Blocking and noggings in metres by level
  • Door frames, doors and hardware by door number
  • Skirting, architraves and reveals in metres by room

FAQ

Questions carpentry businesses ask.

Have you set this up for a business like ours?

Yes, inside a commercial linings and framing setup, where carpentry comes off the same pack. Not carpentry-only yet. Yours starts on your completed jobs.

Does it read our drawing types?

Yes. Plans, wall type schedules, RCPs, sections, door, window and finishes schedules and the spec, as PDF. A sheet with no printed dimension goes to a person.

Will it use our rates?

Yes. Labour as hours per unit from your job cards, plus your timber, board and hardware rates. Supervision, waste, scaffold and sheds are set allowances.

Does it handle first and second fix separately?

Your call. Framing and blocking under first fix, doors, hardware and trims under second, each with its own labour row. Or follow your job card stages.

The App

Put your name down for the App.

Five taps and your email. One of us reads it and replies.

Join the waitlist

Tell us what eats your week.

Join the App waitlist

Launching February 2027. No obligation, one of us replies.