Skip to content

For electricalAvailable now

Every GPO, light and board, counted and priced.

GPOs, fittings by type code, boards, tray and sub-mains, counted off your power and lighting plans and priced from your rates. Your estimator signs off.

Set up by us in your own Claude account. How the estimating plugin works.

  • NDA before we see a drawing
  • Runs in an account you own
  • Your files stay yours
  • Two founders, Brisbane, listed simPRO partner
An electrician in gloves testing contactors in a switchboard with multimeter probes

Sound familiar?

Quoting and amendments are the jobs nobody has time for.

The tender lands in OneDrive and someone counts points sheet by sheet. Boards from the schedule, cable from the schematics. An amendment restarts the count, and variations get keyed into simPRO by hand.

What you get back

Three steps. The last one is yours.

  1. 01

    Drop in the whole folder

    Power, lighting and comms plans, legends, schematics, board schedules and the spec. An amendment redoes only the changed sheets.

  2. 02

    Get the counted list

    Single and double GPOs apart, fittings by type code, isolators, exit lights and boards as counts. Sub-mains, tray and conduit in metres, routes rounded up.

  3. 03

    Your estimator decides

    Cable sizes and protection, the switchboard quote, temporary power, authority fees and compliance certificates. They answer the flags and sign it off.

Marked-up power layout from an electrical takeoff: each outlet tagged with its BOQ line and count, in colour by type.BOQ workbook rows from an electrical takeoff: incoming mains conduit and sub-mains with lengths in metres.
Marked-up drawing

Real output from a job like yours, anonymised

What lands in your workbook for an electrical tender

  • GPOs, fittings, switches and data outlets, sheet on each
  • Mains, sub-mains, tray by width, conduit and trenching
  • Switchboards, pits and isolators from the schedules
  • Exit and emergency lights, counted once across scopes

FAQ

Questions electrical businesses ask.

Have you set this up for a business like ours?

Yes. A fire and electrical business runs it, and an electrical contractor ran a blind takeoff and pricing on a job it had already quoted.

Does it read our drawing types?

Yes. Power, lighting and data plans, legends, schematics and board schedules, as PDF, plus the spec. Flattened drawings are read as images. Scale is proved per sheet.

Will it use our rates?

Yes. Your point rates, labour hours, markup and margin, in your workbook or your existing Excel BOQ with its formulas kept. A missing rate reads MISSING.

What if the schedule and the plan disagree?

The plan is priced and the difference listed as its own line for your estimator to raise. Nothing is averaged, and no cable size is inferred.

The App

Put your name down for the App.

Five taps and your email. One of us reads it and replies.

Join the waitlist

Tell us what eats your week.

Join the App waitlist

Launching February 2027. No obligation, one of us replies.